LAGOMAR INTERCEPTOR FORCE MAIN
Hampton Roads Sanitation District
Virginia Beach, Virginia

MMM provided the design and preparation of construction documents for the installation of approximately 15,000 LF of 54-inch sanitary force main from General Booth Boulevard to the headworks of the Atlantic Treatment Plant. The project included the preparation of a preliminary engineering report, togographic surveys, utility easements, design of ductile iron pipe, coordination of permits, design of the 100-LF aerial crossing of Hells Point Creek, and connection to the existing headworks at the Atlantic Treatment Plant.
|