MMM provided the design and preparation of construction documents for
the installation of approximately 15,000 LF of 54-inch sanitary force
main from General Booth Boulevard to the headworks of the Atlantic
Treatment Plant. The project included the preparation of a preliminary
engineering report, togographic surveys, utility easements, design
of ductile iron pipe, coordination of permits, design of the 100-LF
aerial crossing of Hells Point Creek, and connection to the existing
headworks at the Atlantic Treatment Plant.