After evaluating the existing HVAC systems to determine causes for the
system’s inability to maintain desirable environmental conditions,
MMM recommended corrective action with construction schedules and estimated
costs. A new exterior skin was design for the existing builiding and construction documents were prepared in a separate design
package. MMM prepared annual energy analysis and life cycle cost analysis
on multiple types of building materials, insulation and glass, and
recommendations.
MMM prepared this analysis
in-house on a PC-based Hourly Analysis Program (HAP 3.0). Existing HVAC
equipment capacities were compared
to the heating
and cooling loads for each façade studied. By adding a slight amount
of wall insulation, MMM was able to retain the central heating and cooling
equipment that was otherwise undersized.